Wednesday, May 4, 2011

More "Deconstruction"

Nick and I have been tearing up the old linoleum floors in the bathroom and the front entryway so that Brandon can come lay down tile to match the kitchen and dining room. He finished tiling those two rooms the same day that I went into labor with Evan! As we were pulling up the floors, we also decided to rip out the shower stall in the bathroom and turn that space into a linen closet. This might be a bigger project than Brandon was originally planning to help out with, but it will look so much better once it is all completed. We will owe Brandon BIG TIME! 

Pulling up the staples from the original subfloor in the bathroom. 

Tearing up the subfloor in the entryway. 

Post subfloor entryway

Ripping out the tile above the shower stall

Removing the shower stall 

Evan was supervising all of the deconstruction and wasn't happy about what he was seeing. 

Shower stall ready to be pulled out

Post shower stall, soon-to-be closet

No comments:

Post a Comment